NB226 - MV A2B Vision (5,660 DWT)
Block erection works on a 5,660 DWT cargo/container vessel built at Sedef Shipyard.
Within NB226 - MV A2B Vision (5,660 DWT), CMS AS provided steel fabrication and assembly to class standards at SEDEF TERSANESİ. With an experienced engineering team and certified welders, CMS AS safeguarded dimensional accuracy and weld quality across every work item. The balance of time, cost and quality was observed at every stage of the project.
Scope of Work
The engineering and fabrication items undertaken:
- Block Fabrication: Fabrication of ship blocks through CNC cutting and forming of steel plate and panel-line assembly.
- Erection & Assembly: Erection of the fabricated blocks — alignment and joining on the slipway/dock and application of seam welds.
Engineering & Execution
Engineering, planning and site teams worked in coordination, synchronising the block and outfitting workflow with the shipyard’s master build schedule. Transitions between work items were planned with site safety and efficiency in mind. Coordination between workshop and site teams kept the work items progressing without interruption and safely.
Standards & Quality Assurance
All fabrication processes were performed under approved procedures and class-society survey. Welding was performed to WPS/WPQR-approved procedures and verified by NDT (UT/RT and visual inspection).
As a result, a robust steel structure that will add value for years was delivered. The project was thus completed in line with budget and schedule targets. The experience CMS AS has accumulated in shipbuilding and industrial steel since 1990 makes it a trusted solution partner for shipyards.
Build Journey
Production stages CMS AS undertook on this project
-
Design & Engineering
Delivered by CMS ASProduction drawings, cutting plans and work preparation
-
Steel Cutting & Block Fabrication
Delivered by CMS ASCNC cutting, forming and panel-line fabrication
-
Erection & Assembly
Delivered by CMS ASJoining and welding of blocks on site
-
Piping & Outfitting
Piping circuits, HVAC and equipment installation
-
Surface Prep & Coating
Blasting (ISO 8501-1) and protective coating (ISO 12944)
-
Testing & Delivery
Delivered by CMS ASInspection, testing and handover
Project Details
- Category
- Block Fabrication & Erection
- Üst Yüklenici
- SEDEF TERSANESİ
- Gemi / Müşteri
- MV A2B Vision