NB253 - Landing Craft Tank
Block fabrication, erection and outfitting works on a landing craft tank built at Anadolu Shipyard.
NB253 - Landing Craft Tank is one of the strategic naval platforms of our defence industry; on this project CMS AS took on critical steel fabrication and assembly work at ANADOLU TERSANESİ. From cutting and welding to outfitting and surface treatment, CMS AS delivered an integrated, single-source solution for the project. The zero-defect mindset expected in naval shipbuilding was reflected in every step of production.
Scope of Work
The principal works carried out by CMS AS on this project:
- Block Fabrication: Fabrication of ship blocks through CNC cutting and forming of steel plate and panel-line assembly.
- Erection & Assembly: Erection of the fabricated blocks — alignment and joining on the slipway/dock and application of seam welds.
- Outfitting: Outfitting works: fabrication and installation of piping, HVAC, deck equipment and accommodation systems.
Engineering & Execution
Approved production drawings and cutting plans were prepared before fabrication, and material traceability, dimensional control and weld inspections were recorded throughout the process. The traceability and quality-documentation requirements specific to naval projects were fully met. Critical joints were verified by non-destructive testing (NDT) and dimensional deviations were kept within tolerance.
Standards & Quality Assurance
Every stage was carried out under the CMS AS quality-management system and the supervision of the relevant class society. Welding was performed to WPS/WPQR-approved procedures and verified by NDT (UT/RT and visual inspection). Piping and outfitting systems were handed over after pressure testing and functional checks.
As a result, CMS AS served as a reliable supply partner in producing a platform that contributes to our national defence capability. The project was thus supported on schedule and to defence-industry quality expectations. The experience CMS AS has accumulated in shipbuilding and industrial steel since 1990 makes it a trusted solution partner for shipyards.
Build Journey
Production stages CMS AS undertook on this project
-
Design & Engineering
Delivered by CMS ASProduction drawings, cutting plans and work preparation
-
Steel Cutting & Block Fabrication
Delivered by CMS ASCNC cutting, forming and panel-line fabrication
-
Erection & Assembly
Delivered by CMS ASJoining and welding of blocks on site
-
Piping & Outfitting
Delivered by CMS ASPiping circuits, HVAC and equipment installation
-
Surface Prep & Coating
Blasting (ISO 8501-1) and protective coating (ISO 12944)
-
Testing & Delivery
Delivered by CMS ASInspection, testing and handover
Project Details
- Category
- Block Fabrication & Erection
- Üst Yüklenici
- ANADOLU TERSANESİ
- Gemi / Müşteri
- Landing Craft Tank