CMS AS took end-to-end responsibility for steel production and outfitting on the MV Thiquar Blasting & Painting project at DGS. With a modern machine park and a qualified workforce, CMS AS sustained the required quality even under tight schedule pressure. The balance of time, cost and quality was observed at every stage of the project.

Scope of Work

Services provided by CMS AS throughout the project:

  • Surface & Coating: Surface preparation (abrasive blasting) and protective coating for corrosion protection.

Engineering & Execution

Traceable material management, in-process inspections and final-control steps kept production under control from start to finish, with non-conformities resolved quickly on site. Transitions between work items were planned with site safety and efficiency in mind. Material certificates, welding records and inspection reports were fully documented to preserve complete traceability.

Standards & Quality Assurance

Production was completed in full compliance with international maritime and industrial standards. Surface preparation was to ISO 8501-1 (Sa 2½) cleanliness and the protective coating applied to an ISO 12944 system.

As a result, a robust steel structure that will add value for years was delivered. The project was thus completed in line with budget and schedule targets. The experience CMS AS has accumulated in shipbuilding and industrial steel since 1990 makes it a trusted solution partner for shipyards.

Build Journey

Production stages CMS AS undertook on this project

  1. Design & Engineering

    Delivered by CMS AS

    Production drawings, cutting plans and work preparation

  2. Steel Cutting & Block Fabrication

    CNC cutting, forming and panel-line fabrication

  3. Erection & Assembly

    Joining and welding of blocks on site

  4. Piping & Outfitting

    Piping circuits, HVAC and equipment installation

  5. Surface Prep & Coating

    Delivered by CMS AS

    Blasting (ISO 8501-1) and protective coating (ISO 12944)

  6. Testing & Delivery

    Delivered by CMS AS

    Inspection, testing and handover

Canlı AIS Konumu — IMO 9793052

Canlı konum için MarineTraffic →

IMO Doğrulanmış
IMO 9793052
MV Thiquar
MarineTraffic'te Takip Et

Project Details

Category
Blasting & Painting
Üst Yüklenici
DGS
Gemi / Müşteri
MV Thiquar

İş Kapsamı

KUMLAMA & RASPA BOYA

Looking for a Similar Project?

Our expert team is ready to evaluate your needs.

Contact Us