NB214 - Karadeniz Powership Osman Khan (240 MW)
Outfitting fabrication works on one of the world's most powerful powerships, the 240 MW Karadeniz Powership Osman Khan, at Sedef Shipyard.
On the NB214 - Karadeniz Powership Osman Khan (240 MW) floating power plant, CMS AS undertook heavy steel construction and outfitting fabrication at SEDEF TERSANESİ. With an experienced engineering team and certified welders, CMS AS safeguarded dimensional accuracy and weld quality across every work item. The structural durability required for uninterrupted power generation at sea was kept at the centre of fabrication.
Scope of Work
The engineering and fabrication items undertaken:
- Outfitting: Outfitting works: fabrication and installation of piping, HVAC, deck equipment and accommodation systems.
- Assembly: Precise installation of equipment and modules onto the vessel/structure.
Engineering & Execution
Engineering, planning and site teams worked in coordination, synchronising the block and outfitting workflow with the shipyard’s master build schedule. The heavy-load and vibration-resistance requirements of power-plant structures were met in line with design criteria. Coordination between workshop and site teams kept the work items progressing without interruption and safely.
Standards & Quality Assurance
All fabrication processes were performed under approved procedures and class-society survey. Piping and outfitting systems were handed over after pressure testing and functional checks.
As a result, a platform serving energy supply across different geographies was safely launched. The power-generation platform was thus delivered with reliable, durable steel structures. The experience CMS AS has accumulated in shipbuilding and industrial steel since 1990 makes it a trusted solution partner for shipyards.
Build Journey
Production stages CMS AS undertook on this project
-
Design & Engineering
Delivered by CMS ASProduction drawings, cutting plans and work preparation
-
Steel Cutting & Block Fabrication
Delivered by CMS ASCNC cutting, forming and panel-line fabrication
-
Erection & Assembly
Delivered by CMS ASJoining and welding of blocks on site
-
Piping & Outfitting
Delivered by CMS ASPiping circuits, HVAC and equipment installation
-
Surface Prep & Coating
Blasting (ISO 8501-1) and protective coating (ISO 12944)
-
Testing & Delivery
Delivered by CMS ASInspection, testing and handover
Project Details
- Category
- Pipe & Outfitting
- Üst Yüklenici
- SEDEF TERSANESİ
- Gemi / Müşteri
- Karadeniz Powership Osman Khan