NB208 - KPS 8 Osman Bey Floating Power Plant
Pipe & Outfitting

NB208 - KPS 8 Osman Bey Floating Power Plant

Projects / Pipe & Outfitting / NB208 - KPS 8 Osman Bey Floating Power P...

Outfitting fabrication works on Karadeniz Holding's KPS 8 Osman Bey at Sedef Shipyard.

On the NB208 - KPS 8 Osman Bey Floating Power Plant floating power plant, CMS AS undertook heavy steel construction and outfitting fabrication at SEDEF TERSANESİ. With an experienced engineering team and certified welders, CMS AS safeguarded dimensional accuracy and weld quality across every work item. The structural durability required for uninterrupted power generation at sea was kept at the centre of fabrication.

Scope of Work

The engineering and fabrication items undertaken:

  • Outfitting: Outfitting works: fabrication and installation of piping, HVAC, deck equipment and accommodation systems.
  • Steel Fabrication: Industrial steel-structure fabrication, machining and welded assembly.

Engineering & Execution

Engineering, planning and site teams worked in coordination, synchronising the block and outfitting workflow with the shipyard’s master build schedule. The heavy-load and vibration-resistance requirements of power-plant structures were met in line with design criteria. Coordination between workshop and site teams kept the work items progressing without interruption and safely.

Standards & Quality Assurance

All fabrication processes were performed under approved procedures and class-society survey. Welding was performed to WPS/WPQR-approved procedures and verified by NDT (UT/RT and visual inspection). Piping and outfitting systems were handed over after pressure testing and functional checks.

As a result, a platform serving energy supply across different geographies was safely launched. The power-generation platform was thus delivered with reliable, durable steel structures. The experience CMS AS has accumulated in shipbuilding and industrial steel since 1990 makes it a trusted solution partner for shipyards.

Build Journey

Production stages CMS AS undertook on this project

  1. Design & Engineering

    Delivered by CMS AS

    Production drawings, cutting plans and work preparation

  2. Steel Cutting & Block Fabrication

    Delivered by CMS AS

    CNC cutting, forming and panel-line fabrication

  3. Erection & Assembly

    Joining and welding of blocks on site

  4. Piping & Outfitting

    Delivered by CMS AS

    Piping circuits, HVAC and equipment installation

  5. Surface Prep & Coating

    Blasting (ISO 8501-1) and protective coating (ISO 12944)

  6. Testing & Delivery

    Delivered by CMS AS

    Inspection, testing and handover

Canlı AIS Konumu — IMO 9189158

Canlı konum için MarineTraffic →

IMO Doğrulanmış
IMO 9189158
KPS8 Osman Bey
MarineTraffic'te Takip Et

Project Details

Category
Pipe & Outfitting
Üst Yüklenici
SEDEF TERSANESİ
Gemi / Müşteri
KPS8 Osman Bey

İş Kapsamı

TEÇHİZ İMALAT İŞLERİ